Success #1

Bottom 20ft of Cement Silo Stuck for 5 yrs.

A silo used for process-transition storage at a cement plant was used to trial a TEI Fluidizer.  The bottom 20ft of cement had not discharged in almost 5 yrs.

PMT got the cement flowing immediately in plug flow, indicated by the alternating shades of cement discharged from the built up layers inside.

An estimated 600 tons were recovered during the trial.
The silo is now available to be used for fresh product.
Transition Silo
Trial Unit dwarfed by the Silo

 

 

 

 

 

 

 

 